\n
\u00a0<\/strong><\/span><\/p>\nField work<\/strong><\/span><\/p> <\/div>\n<\/div>\n\n\n
\n
Aerial photography was carried out using an unmanned aerial vehicle. Geoscan 201<\/b><\/span>, equipped with a camera Sony ILX<\/b><\/span>. This configuration allows for the production of materials suitable for creating large-scale topographic plans and detailed digital elevation models.<\/p>\n Key shooting parameters:<\/b><\/p>\n\n\nWork area<\/b><\/span> \u2014 113 km\u00b2<\/p>\n<\/li>\nNumber of flights<\/strong> - 7<\/li>\n\nSpatial resolution<\/b> \u2014 4.5 cm\/pixel<\/span><\/p>\n<\/li>\nNumber of photos<\/strong> \u2013 12,100<\/li>\n\nDuration of the field stage (Air Defense + AFS)<\/b> - 4 days<\/span><\/p>\n<\/li>\n<\/ul>\nDespite the large area, the survey was completed within a tight timeframe, meeting all requirements for coverage and the quality of the source data.<\/p> <\/div>\n<\/div>\n <\/div>\n
\n \n
\n
\n
\n <\/div>\n \n \n <\/div>\n <\/div>\n <\/div>\n <\/div>\n <\/div>\n <\/div>\n
\n
\n
\n
\n
\n \n
\n
\n
\u00a0<\/p>\n
Office <\/strong>data processing<\/strong><\/p> <\/div>\n<\/div>\n\n\n
\n
After completing the fieldwork, photogrammetric processing of the aerial survey data was completed. This stage included:<\/p>\n
\n\nphoto alignment;<\/p>\n<\/li>\n
\nconstruction of a dense point cloud;<\/p>\n<\/li>\n
\nformation of a digital elevation model;<\/p>\n<\/li>\n
\ncreation of an orthophotoplan.<\/p>\n<\/li>\n<\/ul>\n
AFS data processing period<\/b> - 4 days.<\/span><\/p>\nThe result was obtained orthophotomap with a spatial resolution of 4.5 cm\/pixel<\/b><\/span>, providing high surface detail and suitable for engineering and analytical tasks.<\/p> <\/div>\n<\/div>\n <\/div>\n <\/div>\n \n
\n \n
\n
\n
\n <\/div>\n \n \n <\/div>\n <\/div>\n
\n \n
\n
\n
\n <\/div>\n \n \n <\/div>\n <\/div>\n <\/div>\n <\/div>\n <\/div>\n <\/div>\n
\n
\n
\n
\n
\n \n
\n
\n
\u00a0<\/p>\n
Final materials<\/strong><\/p> <\/div>\n<\/div>\n\n\n
\n
The final stage of the project was the creation topographic plan at a scale of 1:500<\/b><\/span>, meeting the requirements for engineering surveys and design work.<\/p>\n Deadline for completing the topographic plan<\/b> \u2014 up to 45 days.<\/span><\/p>\nThe obtained materials allow:<\/p>\n
\n\naccurately assess the features of the relief;<\/p>\n<\/li>\n
\nidentify depressions and directions of water flow;<\/p>\n<\/li>\n
\nuse the data in further design of reclamation and engineering solutions.<\/p>\n<\/li>\n<\/ul> <\/div>\n<\/div>\n <\/div>\n
\n \n
\n
\n
\n <\/div>\n \n \n <\/div>\n <\/div>\n <\/div>\n \n
\n
\n
As a result, the client received a complete set of up-to-date spatial data\u2014from the initial orthophotomap to a large-scale engineering topographic plan. This approach enables informed design decisions and significantly reduces risks in subsequent stages of the project.<\/p> <\/div>\n<\/div>\n <\/div>\n <\/div>\n <\/div>\n <\/div>\n","protected":false},"excerpt":{"rendered":"
Filming for Reclamation Works<\/p>","protected":false},"author":4,"featured_media":11369,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[49],"tags":[],"class_list":["post-11348","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"yoast_head":"\n
\u0421\u044a\u0435\u043c\u043a\u0430 \u0434\u043b\u044f \u043c\u0435\u043b\u0438\u043e\u0440\u0430\u0442\u0438\u0432\u043d\u044b\u0445 \u0440\u0430\u0431\u043e\u0442 - Aerostream<\/title>\n \n \n \n \n \n \n \n \n \n \n \n\t \n\t \n\t \n \n \n \n\t \n\t \n\t \n